Section
1 - Rigging, A/C, D/C, Plumbing |
|
|
|
|
|
|
|
|
|
|
|
|
Rigging includes setting, aliening, and leveling of
installed items.
~Catwalks includes fabing.
~Plumbing includes all materials
~A/C & D/C wiring includes all materials
~D/C bussing includes all materials
~Guards (Railing) includes materials and fabing. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Qty. |
Item |
Include
Rigging |
Wiring
A/C - D/C |
Amps |
Include
Piping |
Piping
Size |
|
|
|
|
|
|
|
|
Air Agitation
Blowers |
|
|
|
|
|
|
Barrel Drives |
|
|
|
|
|
|
|
|
|
|
|
|
|
Brightener
Feeders |
|
|
|
|
|
|
~ Qty =
Feet |
|
|
|
|
|
|
Chemical Feed
Pumps |
|
|
|
|
|
|
|
|
|
|
|
|
|
Coils
(cooling) |
|
|
|
|
|
|
Coils
(heating) |
|
|
|
|
|
|
Condensate
Pumps |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dryer Mono
rail for centrical dryers |
|
|
|
|
|
|
Filters on
tanks under 100º
|
|
|
|
|
|
|
Filters on
tanks over 100º
|
|
|
|
|
|
|
~Guards -
Hand railing Style (Qty = total feet of railing) |
|
|
|
|
|
|
Guards -
Overhead
wide by
long |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Level
Controls - Probe, ball |
|
|
|
|
|
|
Light
Curtains |
|
|
|
|
|
|
Load Cells |
|
|
|
|
|
|
Load Chute |
|
|
|
|
|
|
Load Scales |
|
|
|
|
|
|
Load
Stands/Carts |
|
|
|
|
|
|
Loading Bins |
|
|
|
|
|
|
Panels -
Hoist, barrel drive, sub panels, MCC, remote |
|
|
Yes or no is
for power feed to panels from customer source |
|
pH
Controllers |
|
|
|
|
|
|
Rectifiers -
Up to 30 amp feed |
|
|
Yes or no is
for power feed to panels from customer source |
|
Rectifiers -
30 to 60 amp feed |
|
|
Yes or no is
for power feed to panels from customer source |
|
Rectifiers -
60 to 100 amp feed |
|
|
Yes or no is for power feed
to panels from customer source |
|
Rectifiers -
200 to 300 amp feed |
|
|
Yes or no is for power feed
to panels from customer source |
|
Rectifiers -
400 to 600 amp feed |
|
|
Yes or no is for power feed
to panels from customer source |
|
Rectifier
remotes, Distant from rectifier
in feet. |
|
|
|
|
|
|
Saddles |
|
|
|
|
|
|
Safety
Showers |
|
|
|
|
|
|
|
|
|
|
|
|
|
Shuttle - Wet |
|
|
|
|
|
|
Shuttle - Dry |
|
|
|
|
|
|
Super
Structure (enter in feet)
|
|
|
|
|
|
|
Tanks -
Supports, Rows
|
|
|
|
|
|
|
Tanks -
Setting or removing |
|
|
See Section 2 for tank piping |
|
Temperature
Controllers |
|
|
|
|
|
|
Tote Box
Dumper |
|
|
|
|
|
|
Ultrasonic
System |
|
|
|
|
|
|
Ventilation
Blower (Pull) |
|
|
|
|
|
|
Ventilation
Blower (Push) |
|
|
|
|
|
|
Ventilation
Hood Supports |
|
|
|
|
|
|
Ventilation
Hoods Install |
|
|
|
|
|
|
Vibrator
Feeders |
|
|
|
|
|
|
Water
Softener |
|
|
|
|
|
|
Zinc
Generator |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section 2 -
Additional Plumbing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Qty. |
Item |
Piping
Size |
|
|
|
|
|
|
|
|
|
|
|
|
Compressed
air drops |
|
Ave. size of
connections |
|
Drain Headers
To Sump |
|
|
|
|
|
|
Hose Barbs,
Number of hose barbs to install in water header |
|
|
|
|
|
|
Steam
Bypasses ½" to 1½" for
coils and dryers |
|
|
|
|
|
|
Steam
Bypasses 2" to 3" for
coils and dryers |
|
|
|
|
|
|
Tanks - Air
Agitation Spargers |
|
Ave. size of sparger |
|
Tanks -
Counter Flows |
|
Ave. size of counter flow |
|
Tanks - Tank
Drains |
|
Ave. size of tank drain |
|
Tanks -
Flowing Rinses |
|
Ave. size of flowing rinse
water fill |
|
Tanks -
Overflows |
|
Ave. size of overflow |
|
Tanks - Water
Make-up's |
|
Ave. size of tank water fill |
|
Rectifier
Cooling |
|
Ave. size of
rectifier cooling connection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section 3 -
D/C Bussing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Qty. |
Item |
Buss Type |
Distances
to tank |
Bussing Point
On Tank |
|
|
|
|
|
|
|
|
Rectifier
Bussing up to 1,000 amp |
|
|
|
|
Rectifier
Bussing 1,500 to 2,000 amp |
|
|
|
|
Rectifier
Bussing 2,500 to 4,000 amp |
|
|
|
|
Rectifier
Bussing 5,000 to 8,000 amp |
|
|
|
|
Rectifier
Bussing 10,000 to 12,000 amp |
|
|
|
|
Rectifier
Bussing 15,000 to 25,000 amp |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notes -
Add any notes below |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Upon submitting this quote request
form, you will receive your requested quote back within 24 to 48 hours
in most cases. These quotes are ball park quotes as more
information may be needed and site visit maybe required. (At no
charge to customer)
Our ballpark quotes in most cases are within 10% of actual quote
after finalizing. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
*
|
If relocation quote, please
complete the following |
|
|
|
|
|
|
|
|
Relocate from -
City/State: |
|
|
Relocate to -
City/State: |
|
|
|
|
|
|
|
|